Our Associates
Transmission Grid, Western Division
Butwal, Nepal

Transmission and System Operation (TSO) Business Group of Nepal Electricity Authority has three key responsibilities, namely,
(I) design and construction of transmission system of 66 kV and higher voltage level,
(II) operation and maintenance of transmission system of 66 kV and higher voltage level and
(III) scheduling and dispatching of major and medium power stations connected to the Grid.
These three functions are entrusted respectively to the Transmission Line/Substation Construction Department, Grid Operation Department and System Operation Department.
- List of Products Supplied:
- 33 KV Current Transformer
- VRLA Batteries with Connectors
- MFVRLA Batteries 48V 400Ah
- 36 KV Current Transformer